Achievements till date
-
Engagement of Engineering Design Firm for 24 Gully Erosion Sites across the State and the breakdown as per Senatorial Districts is as follows:
-
Ondo Northern Senatorial District 9 sites
-
Ondo Central Senatorial District 11 Sites
-
Ondo Southern Senatorial District 4 Sites
-
Consultant had submitted draft inception report, final inception report and draft Final report of the Engineering Design
-
Engagement of a Geographical Information System (GIS) Consultant for GIS Based mapping of these sites above.
-
The Consultant had submitted inception report and the project is awaiting draft final report.
-
Engagement of a Consultant for the Rejuvenation of (100Ha) of degraded Forest Reserve.